Free plumbing change order generator

Fill in the extra work, add your cost lines, and download a clean plumbing change order. Includes worded reasons for concealed pipe conditions, code work, and fixture swaps. Free, no signup.

Trade

Document options

Your company

Project & client

Change order details

Cost breakdown

DescriptionQtyUnit $

Contract summary

✓ Saved

CHANGE ORDERCONTRACT MODIFICATION

No. 1
—

From (Contractor)

Your Company Name

Project

—

Description of change

—

Cost breakdown

DescriptionQtyUnitAmount
Subtotal$0.00
Overhead & profit (15%)$0.00
Change order total$0.00
Original contract sum$0.00
Net change by prior change orders$0.00
This change order$0.00
Revised contract sum$0.00
Contract time is unchanged.
Your Company Name
Contractor · Signature & date
Client / Owner
Client / Owner · Signature & date

Get paid for what you found

Plumbers run into surprises behind the wall more than most trades. A change order is how the surprise becomes billed work instead of free work.

Pick a reason and the tool words it for you. A concealed pipe condition, like corroded galvanized you could not see. A code requirement. A fixture substitution. Edit it to match what you hit.

Add your cost lines and overhead and profit, and it totals the change. Turn on attachments to reference the photo or the RFI that backs it up, so the approval is easy to give.

Download the branded PDF and get it signed before you cut. Nothing you type leaves your browser.

FAQ

Plumbing Change Order Generator questions

Is this really free?

Yes. No email, no signup, and nothing you type leaves your browser.

Can it help me word it?

Yes. Pick a reason template like a concealed pipe condition, a code requirement, or a fixture substitution, then edit it to fit the work.

Can I attach the RFI or a photo reference?

Yes. Turn on the attachments option and list the drawings, RFIs, or photos your change references, one per line.

Can I change the checklist?

Everything is editable: items, sections, order, and printed columns. The starter list is a starting point, not a cage.

Get paid for the extra work

Werx tracks change orders against the contract so nothing gets billed late or missed. 14-day free trial, no credit card.

No credit card required · Free migration assistance · Cancel anytime

Disclaimer: These free tools and templates are provided for general information and estimating purposes only. All results — including quantities, material and cost estimates, load, sizing, and span figures, scores, and any guidance or warnings — are rough approximations that may not fit your specific project, site conditions, local building codes, or current prices. They are not engineering, architectural, structural, legal, financial, or other professional advice, and are not a substitute for a licensed engineer, architect, contractor, or other qualified professional. Always confirm quantities, sizing, and structural, electrical, mechanical, and code requirements with a licensed professional and your local authority having jurisdiction before purchasing materials or performing any work. Werx makes no warranty as to accuracy and accepts no liability for any decision made using these tools. Use at your own risk. See our Terms of Service.