Free Tool

Free change order generator

Fill in the job details, add your cost lines, and download a clean, professional change order PDF. Trade presets and professionally worded change reasons included. Free, no signup.

Trade

Document options

Your company

Project & client

Change order details

Cost breakdown

DescriptionQtyUnit $

Contract summary

✓ Saved

CHANGE ORDERCONTRACT MODIFICATION

No. 1
—

From (Contractor)

Your Company Name

Project

—

Description of change

—

Cost breakdown

DescriptionQtyUnitAmount
Subtotal$0.00
Overhead & profit (15%)$0.00
Change order total$0.00
Original contract sum$0.00
Net change by prior change orders$0.00
This change order$0.00
Revised contract sum$0.00
Contract time is unchanged.
Your Company Name
Contractor · Signature & date
Client / Owner
Client / Owner · Signature & date
FAQ

Change order questions

Is this really free?

Yes. No email, no signup, and nothing you type leaves your browser.

What if I do not know how to word the change?

Pick your trade, then use "Need wording? Start from a template" to insert a professionally worded change reason: owner requested changes, concealed conditions, code requirements, or substitutions. Edit it to fit your job.

Can I make a simple change order instead of a detailed one?

Yes. The document options switch sections on and off: lump-sum or unit pricing, overhead and profit, sales tax, contract summary, time impact, extra approval lines, and attachments.

Does it track my change orders across the job?

No, that is the catch with a free one-off tool. Werx logs, prices, and tracks every change order against the contract and adds approved changes to your next draw.

Never lose track of a change order again

Werx logs, prices, and tracks change orders automatically, then bills them on the next draw. 14-day free trial, no credit card.

No credit card required · Free migration assistance · Cancel anytime

Disclaimer: These free tools and templates are provided for general information and estimating purposes only. All results — including quantities, material and cost estimates, load, sizing, and span figures, scores, and any guidance or warnings — are rough approximations that may not fit your specific project, site conditions, local building codes, or current prices. They are not engineering, architectural, structural, legal, financial, or other professional advice, and are not a substitute for a licensed engineer, architect, contractor, or other qualified professional. Always confirm quantities, sizing, and structural, electrical, mechanical, and code requirements with a licensed professional and your local authority having jurisdiction before purchasing materials or performing any work. Werx makes no warranty as to accuracy and accepts no liability for any decision made using these tools. Use at your own risk. See our Terms of Service.