Free electrical change order generator

Fill in the extra work, add your cost lines, and download a clean electrical change order. Includes worded reasons for service upgrades, concealed conditions, and code work. Free, no signup.

Trade

Document options

Your company

Project & client

Change order details

Cost breakdown

DescriptionQtyUnit $

Contract summary

✓ Saved

CHANGE ORDERCONTRACT MODIFICATION

No. 1
—

From (Contractor)

Your Company Name

Project

—

Description of change

—

Cost breakdown

DescriptionQtyUnitAmount
Subtotal$0.00
Overhead & profit (15%)$0.00
Change order total$0.00
Original contract sum$0.00
Net change by prior change orders$0.00
This change order$0.00
Revised contract sum$0.00
Contract time is unchanged.
Your Company Name
Contractor · Signature & date
Client / Owner
Client / Owner · Signature & date

The wording is the hard part

Most electricians do not lose money on change orders because of the price. They lose it because they never write the change up, or the wording is too thin to defend.

This tool fixes the wording. Pick a reason and it drops in language you can stand behind. Insufficient service capacity. Concealed conditions in the walls, like old wiring you could not have seen. A code item the inspector now requires. Edit it to match your job.

Add your cost lines and your overhead and profit, and it figures the change order total. Keep it to one simple page, or switch on the contract summary, tax, extra approval lines, and attachments when the job needs the detail.

Download the branded PDF and get it signed before you do the work. Nothing you type leaves your browser.

FAQ

Electrical Change Order Generator questions

Is this really free?

Yes. No email, no signup, and nothing you type leaves your browser.

I am bad at wording the change. Can it help?

Yes. Pick a reason template like insufficient service capacity, concealed conditions in the walls, or a code requirement, then edit it to fit the job.

Can I keep it simple or make it detailed?

Both. Switch sections on and off: lump sum or unit pricing, overhead and profit, tax, contract summary, time impact, extra approval lines, and attachments.

Can I change the checklist?

Everything is editable: items, sections, order, and printed columns. The starter list is a starting point, not a cage.

Never lose track of a change again

Werx logs, prices, and tracks every change order against the contract, then bills it on the next draw. 14-day free trial, no credit card.

No credit card required · Free migration assistance · Cancel anytime

Disclaimer: These free tools and templates are provided for general information and estimating purposes only. All results — including quantities, material and cost estimates, load, sizing, and span figures, scores, and any guidance or warnings — are rough approximations that may not fit your specific project, site conditions, local building codes, or current prices. They are not engineering, architectural, structural, legal, financial, or other professional advice, and are not a substitute for a licensed engineer, architect, contractor, or other qualified professional. Always confirm quantities, sizing, and structural, electrical, mechanical, and code requirements with a licensed professional and your local authority having jurisdiction before purchasing materials or performing any work. Werx makes no warranty as to accuracy and accepts no liability for any decision made using these tools. Use at your own risk. See our Terms of Service.